Yadkin water for Yadkin needs.

 Union County, NC

Intake Facility

A new intake facility will be built at 465 Bay Shore Drive in Norwood, NC. The facility and site have been designed to fit within the residential lakeside neighborhood.

The intake facility will house mechanical and electrical equipment and will include meeting space. Five ~1,250 horsepower (HP) and three ~50 HP vertical turbine pumps will be necessary to convey the projected design flow rates. However, installation of these pumps will occur in phases in the future, as water demand necessitates.